SafeSTS & Gall Thomson Work Together To Launch An Active Emergency Release System For ‘Vision Zero’ Crude Oil Ship
Jul 19, 2023Sanitary Sample Valves Market Forecast: Exploring Growth Potential and Emerging Trends
Sep 04, 2023Valve indicator for potentially explosive environments
Sep 18, 2023Oil and Gas Valves Market Growth Rate, Top Manufacturers Profiles, Applications, Gross Margin, and Share 2032
Nov 27, 2023Automatic Knife Gate Valves Market 2023 Huge Growth Opportunity between 2032
Nov 29, 2023Ten Steps to Erecting a Cam-Lock Form with Don Valdez
Failed to copy link!
National Sales Manager Don Valdez highlights the materials provided to build a Cam-Lock Form, and illustrates the ease with which a Cam-Lock Form can be built.
Gates Concrete Forming Systems has been providing concrete forming challenges since 1948. A true leader in the industry, Gates helps solve residential and commercial forming product challenges of any size.
In this demonstration, Don Valdez, National Retail Sales Manager at Gates & Sons goes through the ten steps of erecting a Cam-Lock Form. Before getting into the details of the build, Valdez reviews the materials that customers will receive with their build kit, including the Gates hardware that is included.
From here, Valdez reviews the steps alongside the brochure that comes with the build kit to illustrate the ease with which customers build and utilize the Gate’s Cam-Lock Form:
Step 1. Set Bottom Plates
Step 2. Place Outside Panels
Step 3. Place Top Tierow & Walers
Step 4. Install Remaining Ties & Walers
Step 5. Add Stiff-backs and Braces
Step 6. Finish Log Cabin Corner
Step 7. Button-Up Inside Form
Step 8. Install Bulkheads
Step 9. Install Stacked Panels
Step 10. Install Scaffold Brackets
This brief presentation illustrates the simplicity with which a Cam-Lock system is built as well as the support available from Gates Concrete Forms. The instructions are straightforward, and all required materials are provided.
For more information, visit GatesConcreteForms.com.